Advanced options

[Closed] Planned Maintenance - Multiple Services, Buildings

-
Service(s) affected
eduroam,
UI-DeviceNet,
UI-Guest Wi-Fi,
Campus Data Network Connectivity
Building(s) affected
College of Public Health Building,
Kinnick Stadium
Category
Planned Maintenance

Wired and wireless network connectivity will be unavailable for 15-30 minutes during the window.

[Closed] Planned Maintenance - Multiple Services, Buildings

-
Service(s) affected
eduroam,
UI-DeviceNet,
UI-Guest Wi-Fi
Building(s) affected
Adler Journalism and Mass Communication Building,
Becker Communication Studies Building,
Cambus Maintenance Facility,
Campus Recreation and Wellness Center,
Clinton Street Building,
English-Philosophy Building,
Fleet Services,
Growing Words CR Lab,
High Strength Waste Treatment Building 1820,
Hydraulics Model Annex,
Hydraulics Wind Tunnel Annex,
Independence Road Annex,
Iowa Lakeside Laboratory,
IT Distribution Center,
Jessup Hall,
Landscape Services Complex,
Lindquist Center,
Lot 11 Parking Attendant Booth,
Lot 3 Parking Booths,
Lot 4 Parking Lot,
Main Library,
MERGE,
Mossman Business Services Building,
Operator Performance Laboratory - Hanger H IC Airport,
Pappajohn Education Center,
Plaza Centre One,
Power Plant,
Stanley Museum of Art,
Towncrest Center,
University Capitol Centre,
University Services Building,
Voxman Music Building,
Water Plant
Category
Planned Maintenance

Wireless network connectivity will be unavailable for 15-30 minutes during the window.

[Closed] Planned Maintenance - Multiple Services, Buildings

-
Service(s) affected
eduroam,
UI-DeviceNet,
UI-Guest Wi-Fi,
Campus Data Network Connectivity
Building(s) affected
Growing Words CR Lab,
Iowa Lakeside Laboratory,
MacLean Hall,
Pappajohn Education Center
Category
Planned Maintenance

Both wired network connectivity will be unavailable for 15-30 minutes during the window.

[Closed] Planned Maintenance - Multiple Services, Buildings

-
Service(s) affected
eduroam,
UI-DeviceNet,
UI-Guest Wi-Fi
Building(s) affected
Carver Biomedical Research Building,
Dental Science Building,
Eckstein Medical Research Building,
Medical Education Building,
Medical Education Research Facility,
Pappajohn Biomedical Discovery Building
Category
Planned Maintenance

Wireless network connectivity will be unavailable for 15-30 minutes during the window.

[Closed] Planned Maintenance - Multiple Services, Buildings

-
Service(s) affected
eduroam,
Campus Data Network Connectivity
Building(s) affected
Biomedical Research Support Facility,
Driving Safety Research Institute,
Environmental Management Facility,
Hawkeye Oral Surgery Clinic,
Hydraulics Annex 1,
Hydraulics Annex 2,
Hydraulics Wave Basin Facility,
Institute for Rural and Environmental Health,
Iowa Geological Survey - Oakdale,
Multi-Tenant Facility,
Myriad Technology Plaza Four,
Myriad Technology Plaza Two,
Oakdale Biology Greenhouse,
Oakdale Shops Building A,
Oakdale Studio Facility,
Oakdale Utility Power Plant,
Physiology Research Laboratory,
UI Bioventures Center
Category
Planned Maintenance

Networking equipment in the listed buildings will be rebooted. Wired and wireless services to the campus network will be not be available during this maintenance.

[Closed] Planned Maintenance - Multiple Services, Buildings

-
Service(s) affected
eduroam,
Campus Data Network Connectivity
Building(s) affected
Burge Hall,
Catlett Residence Hall,
Currier Hall,
Daum Hall,
Hillcrest Hall,
Mayflower Hall,
Parklawn Hall,
Petersen Residence Hall,
Rienow Hall,
Slater Hall,
Stanley Hall
Category
Planned Maintenance

A network maintenance window is reboot networking equipment in the building. Wired and wireless services to the campus network will be not be available during this maintenance.

[Closed] Planned Maintenance - Multiple Services, Buildings

-
Service(s) affected
eduroam,
Campus Data Network Connectivity
Building(s) affected
Beckwith Boathouse,
Carver-Hawkeye Arena,
Duane Banks Field,
Field Hockey Event Management Box,
Field Hockey Grandstand,
Gerdin Athletic Learning Center,
Goschke Family Wrestling Training Center,
Hansen Football Performance Center,
Hawkeye Indoor Track Facility,
Hawkeye Softball Complex,
Hoak Family Golf Complex,
Karro Athletic Hall of Fame,
Kinnick Stadium,
Nagle Family Clubhouse,
Soccer Complex Facility
Category
Planned Maintenance

A network maintenance window is reboot networking equipment in the building. Wired and wireless services to the campus network will be not be available during this maintenance.