A critical hardware component is failing in a significant number of the University’s wireless access points (APs). With the rate of failure increasing, Information Technology Services (ITS) is proactively replacing all affected units ahead of the fall semester.

This project will involve nearly every campus building and is scheduled to take place from Monday, July 7 through Friday, August 20, with work occurring Monday through Saturday.

During the replacement process, users may experience a brief interruption in wireless service—typically lasting 10 to 15 minutes—in areas without overlapping access point coverage.

Buildings with 5 or less APs will be completed by the University of Iowa team as time permits. The list buildings can be found below. Buildings with 5 or more APs will be completed by the PIER group according to the posted Maintenance Schedule. Changes to the Maintenance Schedule may occur and will be reflected in the schedule below. All updates will also be recorded in the Change Log located beneath the Maintenance Schedule.

In some cases APs may be inaccessible due to construction or locked areas. These will be noted in the schedule below and will be completed as possible. 

Maintenance Schedule

DateBuilding AbbreviationBuilding NameCompleted
7/7/2025CATElizabeth Catlett Residence HallYes
7/7/2025PRPresident's ResidenceYes
7/7/2025MMayflower HallYes
7/8/2025DDaum HallYes
7/8/2025CPHBCollege of Public Health BuildingYes
7/8/2025PARKParklawnYes
7/9/2025BBurge Residence HallYes
7/9/2025CCurrier Residence HallYes
7/9/2025STANStanley HallYes
7/9/2025SSRBSocial Sciences Research BuildingYes
7/10/2025HHillcrest Residence HallYes
7/10/2025PMary Louise Petersen Residence HallYes
7/10/2025RRienow HallYes
7/11/2025FHField HouseYes
7/11/2025SSlater HallYes
7/11/2025MEBMedical Education BuildingSeveral Outstanding (Rescheduled to 8/8)
7/12/2025SCSeamans Center for the Engineering Arts and SciencesYes
7/12/2025ERFEngineering Research FacilityYes
7/14/2025MLMedical LaboratoriesYes
7/14/2025MBSBRay B. Mossman Business Services BuildingYes
7/15/2025CNBCollege of Nursing BuildingYes
7/15/2025MERFMedical Education Research FacilitySeveral Outstanding
7/16/2025IRAIndependence Road AnnexYes
7/16/2025VANVan Allen HallYes
7/17/2025CACaywood AptsYes
7/17/2025PBDBJohn and Mary Pappajohn Biomedical Discovery BuildingYes
7/18/2025BLBBoyd Law BuildingYes
7/18/2025EPBEnglish-Philosophy BuildingYes
7/19/2025HFPCStew and LeNore Hansen Football Performance CenterYes
7/19/2025KSKinnick Stadium and Paul W. Brechler Press BoxYes
7/21/2025IMUIowa Memorial UnionYes
7/22/2025AJBPhilip D. Adler Journalism and Mass Communication BuildingYes
7/22/2025CALHCalvin HallYes
7/22/2025THTrowbridge HallYes
7/22/2025MRCMedical Research CenterYes
7/23/2025BSBBowen Science BuildingYes
7/24/2025BBBiology BuildingYes
7/24/2025EMRBJohn W. Eckstein Medical Research BuildingYes
7/25/2025DHDey HouseYes
7/25/2025NHNorth HallYes
7/25/2025MLHMacLean HallYes
7/25/2025USBUniversity Services BuildingYes
7/25/2025CRWCCampus Recreation and Wellness CenterYes
7/26/2025DSBDental Science BuildingYes
7/28/2025BHCBlank Honors CenterYes
7/28/2025SMAStanley Museum of ArtYes
7/28/2025SLPSpence Laboratories of PsychologyYes
7/28/2025STHStuit HallYes
7/29/2025CPBCollege of Pharmacy BuildingYes
7/30/2025CBChemistry BuildingSeveral Outstanding
7/31/2025PBBJohn Pappajohn Business BuildingYes
8/1/2025SCFSoccer Complex FacilityYes
8/1/2025HTRCHawkeye Tennis and Recreation ComplexYes
8/1/2025GALCRussell and Ann Gerdin Athletic Learning CenterYes
8/1/2025KHFRoy G. Karro Athletic Hall of FameYes
8/1/2025GSTCGymnastics/Spirit Squad Training CenterYes
8/2/2025GFWC - IWTFIowa Wrestling Training Facility 
8/2/2025CHACarver-Hawkeye Arena 
8/2/2025HLIState Hygienic Laboratory at the University of Iowa 
8/4/2025HAHancher Auditorium 
8/4/2025TBTheatre Building 
8/5/2025JBJefferson Building 
8/5/2025LIBLibrary 
8/6/2025BCSBSamuel L. Becker Communication Studies Building 
8/6/2025LCLindquist Center 
8/7/2025CBRBRoy J. and Lucille A. Carver Biomedical Research Building 
8/7/2025WLWestlawn 
8/8/2025MEBMEB (Remaining APs) 
8/8/2025PAXPerforming Arts Annex 
8/8/2025RIV8108 River Street 
8/8/2025ABWArt Building West 
8/9/2025CMABCollege of Medicine Administration Building 
8/9/2025WCTCWest Campus Transportation Center 
8/9/2025SHLC. Maxwell Stanley Hydraulics Laboratory 
8/11/2025HIT-JABRichard O. Jacobson Athletic Building 
8/11/2025IBIFIowa Bioscience Innovation Facility 
8/11/2025HLHSHardin Library for Health Sciences 
8/12/2025BHJohn G. Bowman House 
8/12/2025IATLIowa Advanced Technology Laboratories 
8/12/2025UCCUniversity Capitol Centre 
8/13/2025PBSBPsychological and Brain Sciences Building 
8/13/2025MHMacbride Hall 
8/14/2025GILHGilmore Hall 
8/14/2025HHHalsey Hall 
8/14/2025PHPhillips Hall 
8/14/2025SLSciences Library 
8/14/2025NWPNonfiction Writing House 
8/14/2025MSSBMadison Street Services Building 
8/15/2025JHJessup Hall 
8/15/2025SHSchaeffer Hall 
8/15/2025PCOPlaza Centre One 
8/16/2025PCPomerantz Center 
8/16/2025BBEBiology Building East 
8/16/2025EMFEnvironmental Management Facility 
8/18/2025BRSFBiomedical Research Support Facility 
8/18/2025IREHInstitute for Rural and Environmental Health 
8/18/2025BVCUI Bioventures Center 
8/18/2025MTFMulti-Tenant Facility 
8/18/2025MTP4Myriad Technology Plaza Four 
8/19/2025VOXVoxman Music Building 
8/20/2025CLSBClinton Street Building 
8/20/2025VABVisual Arts Building 
8/20/2025NFCHNagle Family Clubhouse 

 

Change Log

DateChange Description
7/10Updated migration schedule with new dates for Voxman Music Building and the College of Pharmacy Building:
Voxman rescheduled to 8/19
College of Pharmacy rescheduled to 7/29
7/17Added MEB to 8/8. Building will be revisited to complete remaining 15 APs

List of buildings with 5 or less APs

Building abbreviationBuilding nameCompleted
BASEDuane Banks Baseball StadiumYes
FHEMField Hockey Event Management BoxYes
FMBFinkbine Maintenance BuildingYes
FSFleet ServicesYes
HA1Hydraulics Annex 1Yes
HA2Hydraulics Annex 2Yes
HFGCJames M. Hoak Family Golf ComplexYes
HPR3/CWP1Hospital Parking Ramp No. 3Yes
IMURIowa Memorial Union Parking RampYes
LSCLandscape Services ComplexYes
OBGHOakdale Biology GreenhouseYes
OSBAOakdale Shops Building AYes
OSBBOakdale Shops Building BYes
RPLSResearch Park Landscape ServiceYes
WSSWestside Switch Yes
AACCAfro-American Cultural CenterYes
APACAsian Pacific American Cultural CenterYes
CMFCambus Maintenance FacilityYes
HLEAHydraulics Laboratory East AnnexYes
HLMAHydraulics Laboratory Model AnnexYes
KHKuhl HouseYes
LHPDLaw, Health Policy and Disability CenterYes
LNACLatino-Native American Cultural CenterYes
CHST111 Church StreetYes
HOSCHawkeye Oral Surgery ClinicYes
HWBFHydraulics Wave Basin FacilityYes
HWTAHydraulics Wind Tunnel AnnexYes
LLaundryYes
MTP2Myriad Technology Plaza TwoYes
PACPride Alliance CenterYes
SHSEShambaugh HouseYes
SSSoftball StadiumYes
WPWater PlantYes
BBHP. Sue Beckwith, M.D., BoathouseYes
BELLBedell Entrepreneurship Learning LaboratoryYes
FVGDesign & Construction Temp Location 
OIGSIowa Geological Survey - OakdaleYes
SHSBState Historical Society BuildingYes
ITDCInformation Technology Distribution CenterYes
OCOld CapitolYes
OSFOakdale Studio FacilityYes
PRLPhysiology Research LaboratoryYes
TCCTowncrest CenterYes
Last updated
Article number