Dates affected
-

Network Engineering Services will be upgrading the campus wired infrastructure. During this upgrade, wired and wireless connectivity will be down.

Building(s) affected
Adler Journalism and Mass Communication Building,
Becker Communication Studies Building,
Cambus Maintenance Facility,
Campus Recreation and Wellness Center,
Clinton Street Building,
Engineering Research Facility,
English-Philosophy Building,
Growing Words CR Lab,
High Strength Waste Treatment Building 1820,
Hydraulics Model Annex,
Hydraulics Wind Tunnel Annex,
Independence Road Annex,
Iowa Lakeside Laboratory,
IT Distribution Center,
Jessup Hall,
Landscape Services Complex,
Lindquist Center,
Lot 11 Parking Attendant Booth,
Lot 3 Parking Booths,
Lot 4 Parking Lot,
MacLean Hall,
Madison Street Services Building,
Main Library,
MERGE,
Mossman Business Services Building,
Operator Performance Laboratory - Hanger H IC Airport,
Pappajohn Education Center,
Plaza Centre One,
Seamans Center,
Stanley Museum of Art,
Towncrest Center,
University Capitol Centre,
University Services Building,
Voxman Music Building,
Water Plant
Category
Planned Maintenance
Last updated