Available to
Faculty
Staff
Researchers
IT Professionals
Fees
See Details

ITS-AIS Data, Platforms, and Architecture team provides Oracle Hosting and Administration Services.  These services include the physical design, implementation and maintenance of the database as well as data security, data integrity, backup/recovery, performance monitoring, and tuning.

Current Status

There are currently no alerts.

Maintenance

Services scheduled for maintenance over the next 7 days. Please refer to the calendar view of alerts for a complete schedule.
There is currently no planned maintenance.

Past 90 Days

Color bar indicators flow left to right, from oldest to most recent status.

Alert History

Start: 
Saturday, April 20, 2024 - 5:00am
End: 
Saturday, April 20, 2024 - 9:00am
Description

Multiple Oracle servers will be impacted with the April Infrastructure Day work by EI. Expect brief outages of services running on or utilizing the following Oracle servers: BAGEL, SCONE, TOAST and MELBA.  Disruptions are estimated to last 5 minutes, some may extend longer. Existing or new connections to the database may fail such as running an sql job may need to be restarted. Please review your services for any errors or reschedule processes to avoid this window.

  • Bagel - aprprod, ecoiprod, facprod, hawkirb, isisprod, preqprod, profilep, smacprod, webmiscp
  • Scone - acdbprod, awprod, cfdev, nm01prod, nolij6p, pcrdprod, radarprd, saprod, unipcrdp
  • Toast - dwprod
  • Melba – dwtest
Last updated: 
Saturday, April 20, 2024 - 9:00am
Start: 
Sunday, February 25, 2024 - 3:30am
End: 
Sunday, February 25, 2024 - 6:00am
Description

ITS will apply security updates to the Oracle servers. Each instance on the server will be down for approximately 35-45 minutes per host. Below is an approximate schedule:
Server            Time
fprod-db         3:30am
hprod-db        3:50am
bagel              4:15am
scone             4:15am
zwieback        4:15am
hoagie            4:40am
popo               4:40am
toast               4:40am

Last updated: 
Sunday, February 25, 2024 - 6:00am
Start: 
Sunday, February 18, 2024 - 4:30am
End: 
Sunday, February 18, 2024 - 6:00am
Description

ITS will apply OS updates to the following 5 production Oracle servers . Each instance on the server will be down for approximately 35-45 minutes per host.

Server            Time
bagel              4:40am
hoagie            4:40am
hprod-db        4:40am
popo               4:40am
zwieback        4:40am

Last updated: 
Sunday, February 18, 2024 - 6:00am
Start: 
Sunday, November 12, 2023 - 3:30am
End: 
Sunday, November 12, 2023 - 5:30am
Description

ITS will apply security updates to the Oracle servers. Each instance on the server will be down for approximately 35-45 minutes per host. Below is an approximate schedule:
Server            Time
fprod-db         3:30am
hprod-db        3:50am
bagel              4:15am
scone             4:15am
zwieback        4:15am
hoagie            4:40am
popo               4:40am
toast               4:40am

Last updated: 
Sunday, November 12, 2023 - 5:30am
Start: 
Sunday, September 17, 2023 - 3:30am
End: 
Sunday, September 17, 2023 - 5:30am
Description

ITS will apply security updates to the Oracle servers. Each server will be down for approximately 20-30 minutes during the maintenance window. 

Last updated: 
Sunday, September 17, 2023 - 5:30am
Start: 
Sunday, July 2, 2023 - 5:00am
End: 
Sunday, July 2, 2023 - 5:30am
Description

The Oracle production server Toast will be down for hardware maintenance.

During this time the following production databases will not be available: dwprod

Last updated: 
Sunday, July 2, 2023 - 5:30am
Start: 
Sunday, June 25, 2023 - 4:00am
End: 
Sunday, June 25, 2023 - 5:00am
Description

The Oracle production servers Scone and Crepe will be down for hardware maintenance.

During this time the following production databases will not be available: acdbprod, awprod, cfdev, nm01prod, nolij6p, pcrdprod, radarprd, saprod, unipcrdp.

Last updated: 
Sunday, June 25, 2023 - 5:00am
Start: 
Sunday, June 18, 2023 - 4:00am
End: 
Sunday, June 18, 2023 - 8:00am
Description

The Oracle production servers Toast, Scone, and Crepe will be down for maintenance to upgrade hardware.

During this time the following production databases will not be available: dwprod (university data warehouse), acdbprod, awprod, cfdev, nm01prod, nolij6p, pcrdprod, radarprd, saprod, unipcrdp.

Last updated: 
Sunday, June 18, 2023 - 8:00am
Start: 
Sunday, March 5, 2023 - 5:30am
End: 
Sunday, March 5, 2023 - 7:30am
Description

The University Data Warehouse - DWPROD will be down for maintenance to upgrade hardware for Oracle production server Toast. During this time the following production databases will not be available: dwprod.

Last updated: 
Sunday, March 5, 2023 - 7:30am
Start: 
Wednesday, February 22, 2023 - 7:45am
End: 
Wednesday, February 22, 2023 - 7:30pm
Updates
Wednesday, February 22, 2023 - 7:45pm

The issue has been resolved.

Description

We are experiencing degraded performance with PeopleSoft Financials, Oracle, and SQL that is causing slowness and timeouts. Support staff are investigating the issue.

Last updated: 
Wednesday, April 19, 2023 - 11:00am
Start: 
Sunday, February 19, 2023 - 3:30am
End: 
Sunday, February 19, 2023 - 5:30am
Description

ITS will apply security updates to the Oracle servers. Each instance on the server will be down for approximately 20-30 minutes per host. Below is an approximate schedule:

Server            Time

fprod-db         3:30am
hprod-db        3:50am
bagel              4:15am
garlic              4:15am
scone             4:15am
zwieback        4:15am
hoagie            4:40am
popo               4:40am
toast               4:40am

Last updated: 
Sunday, February 19, 2023 - 5:30am
Start: 
Saturday, January 28, 2023 - 7:00am
End: 
Saturday, January 28, 2023 - 9:00am
Description

The Oracle production server Scone will be down for maintenance to upgrade hardware. During this time the following production databases will not be available: acdbprod, awprod, cfdev, nm01prod, nolij6p, pcrdprod, radarprd.

Last updated: 
Saturday, January 28, 2023 - 9:00am
Start: 
Sunday, November 13, 2022 - 3:30am
End: 
Sunday, November 13, 2022 - 5:30am
Description

ITS will apply security updates to the Oracle servers. Each instance on the server will be down for approximately 20-30 minutes per host. Below is an approximate schedule:

Server            Time

fprod-db         3:30am
hprod-db        3:50am
bagel              4:15am
garlic              4:15am
scone             4:15am
zwieback        4:15am
hoagie            4:40am
popo               4:40am
toast               4:40am

Last updated: 
Sunday, November 13, 2022 - 5:30am
Start: 
Sunday, August 14, 2022 - 3:30am
End: 
Sunday, August 14, 2022 - 5:30am
Description

ITS will apply security updates to the Oracle servers. Each instance on the server will be down for approximately 20-30 minutes per host. Below is an approximate schedule:

Server            Time

fprod-db         3:30am
hprod-db        3:50am
bagel              4:15am
garlic              4:15am
scone             4:15am
zwieback        4:15am
hoagie            4:40am
toast               4:40am

Last updated: 
Sunday, August 14, 2022 - 5:30am
Start: 
Thursday, June 30, 2022 - 5:30pm
End: 
Tuesday, July 19, 2022 - 8:30am
Updates
Tuesday, July 19, 2022 - 8:30am

These issues are resolved. 

Sunday, July 17, 2022 - 12:45pm

The restoration of the data warehouse onto good SAN storage is complete and is available for use. MAUI daily, HRIS, and Financials reloads have completed. Additional data loads will continue through the day today and into Monday. Please let us know of any issues or questions, and thanks for your patience during this process.

There will be a brief 30-minute outage on Monday evening, 7/18 at 7:00pm to perform a snapshot of the warehouse as a recovery point. We expect that to be the last outage associated with the recovery.

Description

A disk failure has caused an outage for many University hosted services and databases. ITS is working to restore services.

Last updated: 
Tuesday, July 19, 2022 - 8:26am
Start: 
Sunday, May 22, 2022 - 3:30am
End: 
Sunday, May 22, 2022 - 5:30am
Description

ITS will apply security updates to the Oracle servers. Each instance on the server will be down for approximately 20-30 minutes per host. Below is an approximate schedule:

Server            Time

fprod-db         3:30am
hprod-db        3:50am
bagel              4:15am
garlic              4:15am
scone             4:15am
zwieback        4:15am
hoagie            4:40am
popo               4:40am
toast               4:40am

Last updated: 
Sunday, May 22, 2022 - 5:30am
Start: 
Sunday, February 6, 2022 - 3:30am
End: 
Sunday, February 6, 2022 - 5:30am
Description

ITS will apply security updates to the Oracle servers. Each instance on the server will be down for approximately 20-30 minutes per host. Below is an approximate schedule:

Server            Time

fprod-db         3:30am
hprod-db        3:50am
bagel              4:15am
garlic              4:15am
scone             4:15am
zwieback        4:15am
hoagie            4:40am
popo               4:40am
toast               4:40am

Last updated: 
Sunday, February 6, 2022 - 5:30am
Start: 
Sunday, January 9, 2022 - 3:30am
End: 
Sunday, January 9, 2022 - 6:00am
Description

ITS will apply security updates to the Oracle servers. Each instance on the server will be down for approximately 20-30 minutes per host besides hoagie and zwieback being up to 2 hours. Below is an approximate schedule:

Server            Time

fprod-db         3:30am
hprod-db        3:50am
hoagie            4:20am
zwieback        4:40am
bagel              5:00am
garlic              5:00am
popo               5:00am
scone             5:00am
toast               5:00am

Last updated: 
Sunday, January 9, 2022 - 6:00am
Start: 
Sunday, December 5, 2021 - 7:00am
End: 
Sunday, December 5, 2021 - 8:00am
Description

The University Data Warehouse, dwprod, will be unavailable so ITS can perform maintenance on the database server toast.

Last updated: 
Sunday, December 5, 2021 - 8:00am
Start: 
Sunday, September 12, 2021 - 3:30am
End: 
Sunday, September 12, 2021 - 6:00am
Description

ITS will apply security updates to the Oracle servers. Each instance on the server will be down for approximately 10-20 minutes per host. Below is an approximate schedule:

Server            Time

fprod-db         3:30am
hprod-db        3:50am
scone             4:10am
garlic              4:20am
bagel              4:30am
popo               4:40am
hoagie            4:50am
zwieback        5:10am
toast               5:20am

Last updated: 
Sunday, September 12, 2021 - 6:00am
Start: 
Sunday, June 13, 2021 - 3:30am
End: 
Sunday, June 13, 2021 - 6:00am
Description

ITS will apply security updates to the Oracle servers. Each instance on the server will be down for approximately 10-20 minutes per host. Below is an approximate schedule:

Server            Time

fprod-db         3:30am
hprod-db        3:50am
scone             4:10am
garlic              4:20am
bagel              4:30am
popo               4:40am
hoagie            4:50am
zwieback        5:10am
toast               5:20am

Last updated: 
Sunday, June 13, 2021 - 6:00am
Start: 
Sunday, February 28, 2021 - 3:30am
End: 
Sunday, February 28, 2021 - 6:00am
Description

ITS will apply security updates to the Oracle servers. Each instance on the server will be down for approximately 10-20 minutes per host. Below is an approximate schedule:

Server            Time

fprod-db         3:30am
hprod-db        3:50am
scone             4:10am
garlic              4:20am
bagel              4:30am
popo               4:40am
hoagie            4:50am
zwieback        5:10am
toast               5:20am

Last updated: 
Sunday, February 28, 2021 - 6:00am
Start: 
Sunday, November 15, 2020 - 3:30am
End: 
Sunday, November 15, 2020 - 6:00am
Description

ITS will apply security updates to the Oracle servers. Each instance on the server will be down for approximately 10-20 minutes per host. Below is an approximate schedule:

Server            Time

fprod-db         3:30am
hprod-db        3:50am
scone             4:10am
garlic              4:20am
bagel              4:30am
popo               4:40am
hoagie            4:50am
zwieback        5:10am
toast               5:20am

Last updated: 
Sunday, November 15, 2020 - 6:00am
Start: 
Sunday, August 16, 2020 - 12:00am
End: 
Sunday, August 16, 2020 - 6:00am
Description

DWPROD will be down for maintenance and upgraded to 19c.

Last updated: 
Sunday, August 16, 2020 - 6:00am
Start: 
Sunday, August 2, 2020 - 3:30am
End: 
Sunday, August 2, 2020 - 6:00am
Description

ITS will apply security updates to the Oracle servers. The schedule for each host is as follows:
 

Server            Time
fprod-db         3:30am

hprod-db        3:50am
scone             4:10am
garlic              4:20am
bagel              4:30am
popo               4:40am
hoagie            4:50am
zwieback        5:10am
toast               5:20am

 

Last updated: 
Sunday, August 2, 2020 - 6:00am
Start: 
Sunday, June 21, 2020 - 5:30am
End: 
Sunday, June 21, 2020 - 6:45am
Description

ITS will apply OS patches to three production Oracle servers (Hoagie, Toast, Zwieback). All instances will be down for approximately 20 minutes per host. Below is an approximate schedule for each host.

Server            Time
hoagie            5:40am
toast               6:00am
zwieback        6:20am

Last updated: 
Sunday, June 21, 2020 - 6:45am
Start: 
Sunday, May 24, 2020 - 3:30am
End: 
Sunday, May 24, 2020 - 6:00am
Description

ITS will be applying the quarterly Oracle security patch to all production Oracle servers.  The security patch install requires that all instances on the server be brought down. The install will take approximately 10-20 minutes per host. Below is an approximate schedule for each host:
 

Server            Time

fprod-db         3:30am

hprod-db        3:50am

scone             4:10am

garlic              4:20am

bagel              4:30am

popo               4:40am

hoagie            4:50am

zwieback        5:10am

crepe              5:20am

toast               5:30am

Last updated: 
Sunday, May 24, 2020 - 6:00am
Start: 
Sunday, January 26, 2020 - 3:30am
End: 
Sunday, January 26, 2020 - 6:00am
Description

ITS will apply the quarterly Oracle security patch to all production Oracle servers. All Oracle instances will be down approximately 10 minutes per host. Below is an approximate schedule for each host.

S​​​​​​erver           Time
fprod-db         3:30am
hprod-db        3:50am
popo               4:10am
garlic              4:20am
bagel              4:30am
scone             4:40am
hoagie            4:50am
zwieback        5:10am
crepe              5:20am
toast               5:30am
banana           5:40am

Last updated: 
Sunday, January 26, 2020 - 6:00am
Start: 
Saturday, January 11, 2020 - 5:30am
End: 
Saturday, January 11, 2020 - 7:30am
Description

ITS will be applying an OS patch for the production Oracle servers Hoagie, Toast, Scone and Garlic. All instances on the server be will be unavailable and will take approximately 30 minutes per host.

Server            Time            Datebases
Hoagie            5:30am        HOSPHRP, cdtaprod, filesprd, itconnp, vaultprd, wrkflowp
Toast               6:00am        dwprod
Scone             6:30am         acdbprod, awprod, cfdev, nm01prod, nolij6p, pcrdprod, radarprd, saprod, writctrp
Garlic              7:00am         unipcrdp

 

 

Last updated: 
Saturday, January 11, 2020 - 7:30am
Start: 
Sunday, December 29, 2019 - 5:30am
End: 
Sunday, December 29, 2019 - 7:30am
Description

ITS will be replacing hardware for production Oracle server Popo. All instances on the server will be unavailable.

Impacted instances include: commprod, mauiprod, soapprod, uachprod, unitimep

Last updated: 
Sunday, December 29, 2019 - 7:30am
Start: 
Saturday, December 21, 2019 - 5:30am
End: 
Saturday, December 21, 2019 - 7:30am
Description

ITS will be replacing hardware for production Oracle server Bagel. All instances on the server will be unavailable. 

Impacted instances include: ecoiprod, facprod, hawkirb, isisprod, preqprod, smacprod, webmiscp

Last updated: 
Saturday, December 21, 2019 - 7:30am
Start: 
Tuesday, November 12, 2019 - 8:00am
End: 
Tuesday, November 12, 2019 - 1:00pm
Description

ITS will apply Oracle Native Network Encryption to all production Oracle servers.  Oracle services will remain available during the maintenance window.

Contact the ITS Oracle Database Administration Team at ITS-DPA-Oracle-Notify@uiowa.edu if you have questions or concerns.

Last updated: 
Tuesday, November 12, 2019 - 1:00pm
Start: 
Sunday, October 27, 2019 - 3:30am
End: 
Sunday, October 27, 2019 - 6:00am
Description

ITS will be applying the quarterly Oracle security patch to all production Oracle servers. The security patch install requires that all instances on the server be brought down, the install will take approximately 10 minutes per host. Below is an approximate schedule for each host.
 
Server           Time
fprod-db         3:30am
hprod-db        3:50am
scone             4:10am
garlic              4:20am
bagel              4:30am
popo               4:40am
hoagie            4:50am
toast               5:10am
crepe              5:20am

Last updated: 
Sunday, October 27, 2019 - 6:00am
Start: 
Sunday, August 18, 2019 - 3:30am
End: 
Sunday, August 18, 2019 - 6:00am
Description

ITS will be applying the quarterly Oracle security patch to all production Oracle servers. The security patch install requires that all instances on the server be brought down, the install will take approximately 10 minutes per host. Below is an approximate schedule for each host.

Server            Time
fprod-db         3:30am
hprod-db        3:50am
scone             4:10am
garlic              4:20am
bagel              4:30am
popo               4:40am
hoagie            4:50am
zwieback        5:10am
crepe              5:20am
toast               5:30am
banana           5:40am
 

 

Last updated: 
Sunday, August 18, 2019 - 6:00am
Start: 
Sunday, May 26, 2019 - 6:00am
End: 
Sunday, May 26, 2019 - 8:00am
Description

ITS will be replacing hardware for the production Oracle server Toast.  The University Data Warehouse, DWPROD, will be unavailable during this time.

Last updated: 
Sunday, May 26, 2019 - 11:36pm
Start: 
Sunday, May 5, 2019 - 5:00am
End: 
Sunday, May 5, 2019 - 7:00am
Description

ITS will be replacing hardware for the production Oracle server Hoagie. All instances on the server will be unavailable. 

Impacted instances include: HOSPHRP, cdtaprod, filesprd, vaultprd, wrkflowp.

Last updated: 
Sunday, May 5, 2019 - 7:00am
Start: 
Sunday, April 28, 2019 - 3:30am
End: 
Sunday, April 28, 2019 - 6:00am
Description

ITS will be applying the quarterly Oracle security patch to all production Oracle servers.  The security patch install requires that all instances on the server be brought down, the install will take approximately 10 minutes per host. Below is an approximate schedule for each host.

 

Server            Time
fprod-db         3:30am
hprod-db        3:50am
scone             4:10am
garlic              4:20am​​​​​​​
bagel              4:30am
popo               4:40am​​​​​​​
hoagie            4:50am​​​​​​​
ginger             5:00am​​​​​​​
zwieback        5:10am​​​​​​​
crepe              5:20am​​​​​​​​​​​​​​
toast               5:30am​​​​​​​
banana           5:40am

Last updated: 
Sunday, April 28, 2019 - 6:00am
Start: 
Sunday, February 10, 2019 - 5:00am
End: 
Sunday, February 10, 2019 - 6:00am
Description

ITS will apply OS patches to production Oracle servers Popo and Toast. The patch requires that all instances on the server be brought down. The install will take up to one hour per host.  

Impacted instances: dwprod, mauiprod, commprod, uachprod, soapprod, and unitimep

Last updated: 
Sunday, February 10, 2019 - 6:00am
Start: 
Sunday, January 27, 2019 - 3:30am
End: 
Sunday, January 27, 2019 - 6:00am
Description

ITS will be applying the quarterly Oracle security patch to all production Oracle servers. The security patch install requires that all instances on the server be brought down, the install will take approximately 10 minutes per host. Below is an approximate schedule for each host.

Note: server popo will be getting an OS patch applied, down time will be up to 60 minutes for popo only.

Server             Time
fprod-db         3:30am
hprod-db        3:50am
scone             4:10am
garlic              4:20am
bagel              4:30am
popo               4:40am
hoagie            4:50am
ginger             5:00am
zwieback        5:10am
toast               5:20am
banana           5:30am

Last updated: 
Sunday, January 27, 2019 - 6:00am
Start: 
Sunday, October 28, 2018 - 3:30am
End: 
Sunday, October 28, 2018 - 6:00am
Description

ITS will be applying the quarterly Oracle security patch to all production Oracle servers. The security patch install requires that all instances on the server be brought down, the install will take approximately 10 minutes per host.

Last updated: 
Sunday, October 28, 2018 - 6:00am
Start: 
Sunday, August 12, 2018 - 3:30am
End: 
Sunday, August 12, 2018 - 6:00am
Description

ITS will be applying the quarterly Oracle security patch to all production Oracle servers. The security patch install requires that all instances on the server be brought down, the install will take approximately 10 minutes per host. Below is an approximate schedule for each host.
 
Server            Time
fprod-db         3:30am
hprod-db        3:50am
scone             4:10am
garlic              4:20am
bagel              4:30am
popo               4:40am
crepe              4:50am
hoagie            5:00am
ginger             5:10am
zwieback        5:20am
toast               5:30am
banana           5:40am

Last updated: 
Thursday, January 17, 2019 - 10:22am
Start: 
Sunday, July 8, 2018 - 3:30am
End: 
Sunday, July 8, 2018 - 6:00am
Description

ITS will be applying OS patches to the following production Oracle servers.  The patch install requires that all instances on the server be brought down, the install will take up to one hour per host. Below is an approximate schedule for each host.

Server            Time

hprod-db        3:30am

bagel              4:10am

popo               4:40am

ginger             5:10am

banana           5:30am

 

Last updated: 
Sunday, July 8, 2018 - 6:00am
Start: 
Sunday, June 24, 2018 - 3:30am
End: 
Sunday, June 24, 2018 - 6:00am
Description

ITS will be applying OS patches to the following production Oracle servers.  The patch install requires that all instances on the server be brought down, the install will take up to one hour per host. Below is an approximate schedule for each host.

Server            Time

fprod-db         3:30am

scone             4:15am

hoagie            4:50am

zwieback        5:20am

Last updated: 
Sunday, June 24, 2018 - 6:00am
Start: 
Sunday, April 29, 2018 - 3:30am
End: 
Sunday, April 29, 2018 - 6:00am
Description

ITS will be applying the quarterly Oracle security patch to all production Oracle servers.  The security patch install requires that all instances on the server be brought down, the install will take approximately 10 minutes per host. Below is an approximate schedule for each host.
 

Server                   Time

fprod-db              3:30am

hprod-db             3:50am

scone                    4:10am

garlic                     4:20am

bagel                     4:30am

popo                     4:40am

crepe                    4:50am

hoagie                  5:00am

ginger                   5:10am

zwieback             5:20am

toast                      5:30am

 

Note: The test Oracle servers will be patched this Friday April 20 starting at 7pm.

Last updated: 
Sunday, April 29, 2018 - 6:00am
Start: 
Sunday, August 14, 2016 - 4:30am
End: 
Sunday, August 14, 2016 - 6:30am
Description

ITS will be applying the quarterly oracle security patch to the server Bagel along with the majority of the production oracle servers.  The security patch install requires that all instances on the server be brought down, the install will take approximately 10 minutes. 

The oracle test servers will be getting patched this Sunday, July 31st starting at 8am, this will not impact prod instances just test.

Oracle instances on the server that will be unavailable during the 10 minute downtime are as follows:

bagel.its.uiowa.edu
ecoiprod
facprod
hawkirb
isisprod
preqprod
smacprod
webmiscp

fprod-db        3:30am
hprod-db       3:50am
scone            4:10am
garlic             4:20am
bagel            4:30am
popo             4:40am
crepe            4:50am
hoagie           5:00am
ginger             5:10am
flat                   5:20am
s-lib003           5:30am
ihprod              5:40am
zwieback          5:50am
toast                 6:00am

 

Last updated: 
Sunday, August 14, 2016 - 6:30am