The University of Iowa enterprise datacenters house computer systems that run production services critical to students, faculty, and staff. Enterprise datacenters also provide robust, state-of-the-art server colocation space and associated support services for campus departments and researchers.

Current Status

There are currently no alerts.

Maintenance

Services scheduled for maintenance over the next 7 days. Please refer to the calendar view of alerts for a complete schedule.
There is currently no planned maintenance.

Past 90 Days

Color bar indicators flow left to right, from oldest to most recent status.

Alert History

Start: 
Saturday, January 13, 2024 - 6:00am
End: 
Saturday, January 13, 2024 - 8:30am
Description

NetApp clusters at ITF and LC datacenters will be upgraded. Each volume will experience two brief (10-30 seconds) pauses in IO.

Last updated: 
Saturday, January 13, 2024 - 8:30am
Start: 
Saturday, October 14, 2023 - 6:00am
End: 
Saturday, October 14, 2023 - 8:00am
Description

NetApp clusters at ITF and LC datacenters will be upgraded. Each volume will experience two brief (10-30 seconds) pauses in IO.

Last updated: 
Saturday, October 14, 2023 - 8:00am
Start: 
Saturday, August 12, 2023 - 5:00am
End: 
Saturday, August 12, 2023 - 8:00am
Description

The F5 LTMs will be updated to the newest long-term software release to ensure continued support beyond December 2023. No impact to services is expected.

Last updated: 
Saturday, August 12, 2023 - 8:00am
Start: 
Wednesday, August 2, 2023 - 5:00pm
End: 
Wednesday, August 2, 2023 - 7:00pm
Description

NetApp clusters at ITF and LC datacenters will have maintenance performed on the cluster nodes. Each volume will experience two brief (10-30 seconds) pauses in input/output.

Clusters affected:

  • ITFNA1
  • ITFNA3
  • LCNA1
Last updated: 
Wednesday, August 2, 2023 - 7:00pm
Start: 
Thursday, July 27, 2023 - 5:00pm
End: 
Thursday, July 27, 2023 - 7:00pm
Description

ITS-TPS will be applying an urgent NetApp update to the UDSS, CLAS, ADSS, HOME, and VM services. NetApp clusters at ITF datacenters will be upgraded. Each volume will experience two brief (10-30 seconds) pauses in IO.

Last updated: 
Thursday, July 27, 2023 - 7:00pm
Start: 
Wednesday, July 26, 2023 - 5:00pm
End: 
Wednesday, July 26, 2023 - 7:00pm
Description

ITS-TPS will be applying an urgent NetApp update to the RDSS service. NetApp clusters at ITF datacenters will be upgraded. Each volume will experience two brief (10-30 seconds) pauses in IO.

Last updated: 
Wednesday, July 26, 2023 - 7:00pm
Start: 
Saturday, June 10, 2023 - 6:00am
End: 
Saturday, June 10, 2023 - 8:00am
Description

NetApp clusters at ITF and LC datacenters will be upgraded. Each volume will experience two brief (10-30 seconds) pauses in IO. The F5 GTNs (DNS) will be updated to the newest long-term software release. No impact to services is expected.

Last updated: 
Saturday, June 10, 2023 - 8:00am
Start: 
Saturday, April 8, 2023 - 4:00am
End: 
Saturday, April 8, 2023 - 8:00am
Description

The F5 hardware chassis will be updated to the newest long-term software release to ensure continued support beyond December 2023.

Last updated: 
Saturday, April 8, 2023 - 8:00am
Start: 
Monday, February 27, 2023 - 12:30pm
End: 
Monday, February 27, 2023 - 4:15pm
Updates
Monday, February 27, 2023 - 4:15pm

This issue has been resolved.

Description

A network device at ITF is unavailable and impacting several systems. NES engineers are heading to ITF to investigate. CAS,SAS, and TPS teams have been notified.

More details on affected systems will be forthcoming.

Last updated: 
Monday, February 27, 2023 - 4:18pm
Start: 
Tuesday, December 6, 2022 - 7:00pm
End: 
Tuesday, December 6, 2022 - 9:00pm
Description

ITS will be patching Brocade SAN fabric switches from Fabric OS 9.0.1e to Fabric OS v9.1.1.

We will test the install on the San Fabric B and evaluate the change. If the change is successful we will proceed with SAN A and SAN C.

This is intended to be a non-interruptive change. This process is repeated until all switches are patched.

Last updated: 
Tuesday, December 6, 2022 - 9:00pm
Start: 
Sunday, November 20, 2022 - 6:00am
End: 
Sunday, November 20, 2022 - 8:00am
Description

The F5 Global Traffic Managers (GTM) will be updated to the latest software release on our current branch for the ITF & LC data centers.

Last updated: 
Sunday, November 20, 2022 - 8:00am
Start: 
Saturday, October 8, 2022 - 6:00am
End: 
Saturday, October 8, 2022 - 8:00am
Description

The F5 Global Traffic Managers (GTM) will be updated to the latest software release on our current branch for the ITF & LC data centers.

Last updated: 
Saturday, October 8, 2022 - 8:00am
Start: 
Sunday, September 11, 2022 - 6:00am
End: 
Sunday, September 11, 2022 - 8:00am
Description

During this time the NetApp clusters will be updated in the Lindquist and ITF data centers. Each volume will experience two brief (10-30 second) pauses in sending and receiving data.

Last updated: 
Sunday, September 11, 2022 - 8:00am
Start: 
Tuesday, July 26, 2022 - 5:00pm
End: 
Tuesday, July 26, 2022 - 9:00pm
Description

EI-TPS will be applying an urgent priority disk firmware upgrade to a subset of disks in the Unity SAN in ITF.  This process runs as an automated background task and should not have any impact on the data or services that use the SAN.  However, due to the recent issues with the SAN outage in early July, we are proactively notifying for this instance of this work.

If there are any concerns or questions during the maintenance window, please contact the ITS Help Desk for escalation to the EI-TPS on-call staff.

Last updated: 
Tuesday, July 26, 2022 - 9:00pm
Start: 
Monday, July 25, 2022 - 5:00pm
End: 
Monday, July 25, 2022 - 9:00pm
Description

EI-TPS will be applying an urgent priority disk firmware upgrade to a subset of disks in the Unity SAN in ITF.  This process runs as an automated background task and should not have any impact on the data or services that use the SAN.  However, due to the recent issues with the SAN outage in early July, we are proactively notifying for this instance of this work.

If there are any concerns or questions during the maintenance window, please contact the ITS Help Desk for escalation to the EI-TPS on-call staff.

Last updated: 
Monday, July 25, 2022 - 9:00pm
Start: 
Saturday, March 12, 2022 - 6:00am
End: 
Saturday, March 12, 2022 - 8:00am
Description

During this time the NetApp clusters will be updated in the Lindquist and ITF data centers. Each volume will experience two brief (10-30 second) pauses in I/O.

Last updated: 
Saturday, March 12, 2022 - 8:00am
Start: 
Saturday, February 19, 2022 - 5:30am
End: 
Saturday, February 19, 2022 - 8:00am
Description

The ITS Network Engineering Services (NES) team will be adjusting default routing in production data center routers, and once adjustments are completed Technology Platform Services (TPS) will be updating the F5 chassis in the same locations. 

The maintenance will take place in sequence at Lindquist Center (LC14), followed by the Information Technology Facility (ITF) location. 

No impact to services is expected while maintenance is completed.

Last updated: 
Saturday, February 19, 2022 - 8:00am
Start: 
Saturday, September 11, 2021 - 6:00am
End: 
Saturday, September 11, 2021 - 8:00am
Description

The F5 chassis will be updated in both data centers. No impact on services is expected. 

Last updated: 
Saturday, September 11, 2021 - 8:00am
Start: 
Wednesday, June 30, 2021 - 8:30pm
End: 
Wednesday, June 30, 2021 - 10:00pm
Description

A firmware update is scheduled for the Dell EMC SAN storage arrays in this location. No interruption of services is expected.

Buildings
Information Technology Facility
Last updated: 
Wednesday, June 30, 2021 - 10:00pm
Start: 
Tuesday, June 29, 2021 - 5:30pm
End: 
Tuesday, June 29, 2021 - 7:00pm
Description

A firmware update is scheduled for the Dell EMC SAN storage arrays in this location. No interruption of services is expected.

Buildings
Lindquist Center
Last updated: 
Tuesday, June 29, 2021 - 7:00pm
Start: 
Saturday, April 10, 2021 - 6:00am
End: 
Saturday, April 10, 2021 - 8:00am
Description

During this time the NetApp clusters will be updated in the Lindquist (LC) data center. Each volume will experience two brief (10-30 second) pauses in I/O.

Last updated: 
Saturday, April 10, 2021 - 8:00am
Start: 
Saturday, March 13, 2021 - 6:00am
End: 
Saturday, March 13, 2021 - 8:00am
Description

During this time the NetApp clusters will be updated in the Lindquist and ITF data centers. Each volume will experience two brief (10-30 second) pauses in I/O.

Last updated: 
Saturday, March 13, 2021 - 8:00am
Start: 
Wednesday, February 24, 2021 - 5:30pm
End: 
Wednesday, February 24, 2021 - 7:00pm
Description

A firmware update will be applied to the Dell EMC SAN storage array in ITF. No impact to services expected.

Buildings
Information Technology Facility
Last updated: 
Wednesday, February 24, 2021 - 7:00pm
Start: 
Tuesday, February 23, 2021 - 5:30pm
End: 
Tuesday, February 23, 2021 - 7:00pm
Description

A firmware update will be applied to the Dell EMC SAN storage array in LC. No impact to services expected.

Buildings
Lindquist Center
Last updated: 
Tuesday, February 23, 2021 - 7:00pm
Start: 
Saturday, February 6, 2021 - 4:00am
End: 
Saturday, February 6, 2021 - 8:00am
Description

During this time the F5 chassis will be updated in the Lindquist and ITF data centers. No impact on services is expected. 

Last updated: 
Saturday, February 6, 2021 - 8:00am
Start: 
Saturday, January 9, 2021 - 5:00am
End: 
Saturday, January 9, 2021 - 8:00am
Description

Nature of the work – Upgrade the F5 ITF LTM system software to stay current with releases, improve reliability, address security issues, and provide new features.
Which data center(s) –ITF
Expected impact on services – None
Expected duration – 3 hours

The ITF F5 LTM systems are a redundant pair. The F5 LTMs in ITF will be upgraded as follows:

  1. Upgrade standby LTM;
  2. Shift services from the primary LTM to the standby LTM;
  3. Allow service and application owners ONE HOUR (*) to test their applications against the new LTM software;
  4. Upgrade primary LTM;
  5. Shift services from the standby LTM back to the primary LTM.

(*) In between the upgrade of the standby and primary LTMs, services will be shifted to the upgraded LTM. At that time, system and application owners will be given a ONE HOUR time block to test their applications and services against the new LTM software. If no major issues are discovered, the second LTM will be upgraded and the process will be complete. Estimated start time for this one hour block is around 05:30am, but encourage customers to be on the conference bridge ahead of time to take full advantage of the one hour block.

Last updated: 
Saturday, January 9, 2021 - 8:00am
Start: 
Sunday, November 15, 2020 - 4:00am
End: 
Sunday, November 15, 2020 - 8:00am
Description

Nature of the work – Upgrade the F5 GTM and LC LTM system software to stay current with releases, improve reliability, address security issues, and provide new features.
Which data center(s) – LC & ITF
Expected impact on services – None

The F5 GTM/DNS systems provide the same DNS information. The ITF F5 GTM/DNS system will be upgraded first followed by the LC F5 GTM/DNS system. The LC F5 LTM systems are a redundant pair in each data center. The F5 LTMs in LC will be upgraded as follows:

  1. Upgrade standby LTM
  2. Shift services from the primary LTM to the standby LTM
  3. Allow service and application owners ONE HOUR (*) to test their applications against the new LTM software
  4. Upgrade primary LTM
  5. Shift services from the standby LTM back to the primary LTM

(*) In between the upgrade of the standby and primary LTMs, services will be shifted to the upgraded LTM. At that time, system and application owners will be given a ONE HOUR time block to test their applications and services against the new LTM software. If no major issues are discovered, the second LTM will be upgraded and the process will be complete. Estimated start time for this one hour block is around 05:30am, but encourage customers to be on the conference bridge ahead of time to take full advantage of the one hour block.

Last updated: 
Sunday, November 15, 2020 - 8:00am
Start: 
Wednesday, October 28, 2020 - 5:30pm
End: 
Wednesday, October 28, 2020 - 7:00pm
Description

A firmware update will be applied to the Brocade Fiber optic SAN fabric B switches. There will be no expected impact to services.

Buildings
Information Technology Facility
Lindquist Center
Last updated: 
Wednesday, October 28, 2020 - 7:00pm
Start: 
Tuesday, October 27, 2020 - 5:30pm
End: 
Tuesday, October 27, 2020 - 7:00pm
Description

A firmware update will be applied to the Brocade Fiber optic SAN fabric B switches. There will be no expected impact to services.

Buildings
Information Technology Facility
Lindquist Center
Last updated: 
Tuesday, October 27, 2020 - 7:00pm
Start: 
Saturday, October 17, 2020 - 6:00am
End: 
Saturday, October 17, 2020 - 8:00am
Description

Nature of the work – F5 software upgrade test on standby Local Traffic Manager (LTM)
Which data center(s) – LC

Expected impact on services – None
Expected duration – 2 hours

Last updated: 
Saturday, October 17, 2020 - 8:00am
Start: 
Saturday, August 8, 2020 - 4:00am
End: 
Saturday, August 8, 2020 - 8:00am
Description

Scheduled Work: F5 chassis maintenance
Data Center(s): Lindquist Center (LC) and Information Technology Facility (ITF)
Expected Impact on Services: None
Expected Duration: 4 hours

Last updated: 
Saturday, August 8, 2020 - 8:00am
Start: 
Monday, July 6, 2020 - 10:30am
End: 
Monday, July 6, 2020 - 6:30pm
Description

Nature of the work – Upgrade the F5 GTM/DNS systems system software to stay current with releases, improve reliability, address security issues, and provide new features.

Work process - The F5 GTM/DNS systems provide the same DNS information. The ITF F5 GTM/DNS system will be upgraded first followed by the LC F5 GTM/DNS system. No service impact is expected.

Last updated: 
Monday, July 6, 2020 - 2:49pm
Start: 
Monday, July 6, 2020 - 10:30am
End: 
Monday, July 6, 2020 - 6:30pm
Description

Nature of the work – Upgrade the F5 LTM system software to stay current with releases, improve reliability, address security issues, and provide new features.

Work process - The F5 LTM systems are a redundant pair in each data center. Each F5 LTM pair will be upgraded as follows: (1) Upgrade standby LTM; (2) shift services from the primary LTM to the standby LTM; (3) upgrade primary LTM; (4) shift services from the standby LTM back to the primary LTM.

Last updated: 
Monday, July 6, 2020 - 2:49pm
Start: 
Monday, July 6, 2020 - 10:30am
End: 
Monday, July 6, 2020 - 6:30pm
Description

Nature of the work – Upgrade the F5 LTM system software to stay current with releases, improve reliability, address security issues, and provide new features.

Work process - The F5 LTM systems are a redundant pair in each data center. Each F5 LTM pair will be upgraded as follows: (1) Upgrade standby LTM; (2) shift services from the primary LTM to the standby LTM; (3) upgrade primary LTM; (4) shift services from the standby LTM back to the primary LTM.

Last updated: 
Monday, July 6, 2020 - 2:49pm
Start: 
Thursday, June 18, 2020 - 6:00am
End: 
Thursday, June 18, 2020 - 8:00am
Description

Nature of the work – Upgrade the F5 ITF LTM system software to stay current with releases, improve reliability, address security issues, and provide new features.

Work process - The F5 LTM systems are a redundant pair in each data center. Each F5 LTM pair will be upgraded as follows: (1) Upgrade standby LTM; (2) shift services from the primary LTM to the standby LTM; (3) upgrade primary LTM; (4) shift services from the standby LTM back to the primary LTM.

 

Last updated: 
Thursday, June 18, 2020 - 8:00am
Start: 
Wednesday, June 17, 2020 - 6:00am
End: 
Wednesday, June 17, 2020 - 8:00am
Description

Nature of the work – Upgrade the F5 LC LTM system software to stay current with releases, improve reliability, address security issues, and provide new features.

Work process - The F5 LTM systems are a redundant pair in each data center. Each F5 LTM pair will be upgraded as follows: (1) Upgrade standby LTM; (2) shift services from the primary LTM to the standby LTM; (3) upgrade primary LTM; (4) shift services from the standby LTM back to the primary LTM.

 

Last updated: 
Wednesday, June 17, 2020 - 8:00am
Start: 
Saturday, June 13, 2020 - 4:00am
End: 
Saturday, June 13, 2020 - 9:00am
Description

Scheduled Work:  Software upgrade for production and research routers

Data Center(s): Information Technology Facility (ITF)

Expected Impact on Services:  The work should not cause any user-visible disruption

Expected Duration:  4 hours total (4 AM - 8 AM) 

 

Scheduled Work: Upgrade NetApp clusters

Data center(s): Information Technology Facility (ITF) and Lindquist Center (LC)

Expected impact on services: Each volume will experience two brief (10-30 seconds) pauses in IO

Expected Duration: 3 hours total (6 AM - 9 AM) 

Services affected include:

Home (H:) Drives:  .pst files located on these drives are particularly sensitive to drops in connectivity. Instruct users to close all applications (Outlook, Word, Excel) to their Home or H: Drive on Friday before leaving work.

Shared Departmental Drives:  L:, I:, and U: SFTP jobs and instruments connected to these locations are sensitive to drops in connectivity.  Modify as necessary.

RDSS:  Research Data Storage Service is included in this upgrade.

Last updated: 
Saturday, June 13, 2020 - 9:00am
Start: 
Thursday, June 4, 2020 - 6:00am
End: 
Thursday, June 4, 2020 - 8:00am
Description

Nature of the work – Upgrade the F5 GTM/DNS systems system software to stay current with releases, improve reliability, address security issues, and provide new features.

Work process - The F5 GTM/DNS systems provide the same DNS information. The ITF F5 GTM/DNS system will be upgraded first followed by the LC F5 GTM/DNS system. No service impact is expected.

 

 

Last updated: 
Thursday, June 4, 2020 - 8:00am
Start: 
Saturday, April 18, 2020 - 5:00am
End: 
Saturday, April 18, 2020 - 8:00am
Description

Scheduled Work:  The ITS Network Services team is rolling out a priority software code upgrade to the data center routers and production switches

Data Center(s):  Lindquist Center (LC)

Expected Impact on Services:  The upgrade has been tested successfully in the lab via in-service software upgrade (ISSU), which is non-disruptive.  There is one switch upgrade that will cause a disruption.  For that specific upgrade case, communication to affected hosting partners is being handled through a separate channel.

Expected Duration:  3 hours

 

Last updated: 
Saturday, April 18, 2020 - 8:00am
Start: 
Saturday, March 14, 2020 - 12:00am
End: 
Saturday, March 14, 2020 - 8:00am
Description

Scheduled Work:  F5 chassis hardware refresh migration

Data Center(s):  Information Technology Facility (ITF)

Expected Impact on Services:  None

Expected Duration:  3 hours

Time:  Midnight - 3:00 AM

 

Scheduled Work:  The ITS Network Services team is rolling out a priority software code upgrade to the data center routers and production switches

Data Center(s):  Information Technology Facility (ITF)

Expected Impact on Services:  The upgrade has been tested successfully in the lab via in-service software upgrade (ISSU), which is non-disruptive.  There is one switch upgrade that will cause a disruption.  For that specific upgrade case, communication to affected hosting partners is being handled through a separate channel.

Expected Duration:  4 hours

Time:  04:00 AM - 08:00 AM

Last updated: 
Saturday, March 14, 2020 - 8:00am
Start: 
Wednesday, February 26, 2020 - 5:30pm
End: 
Wednesday, February 26, 2020 - 7:00pm
Description

A firmware update will be applied to the Dell EMC SAN storage array in Information Technology Facility (ITF).

There are no expected impacts to services.

Buildings
Information Technology Facility
Last updated: 
Wednesday, February 26, 2020 - 7:00pm
Start: 
Tuesday, February 25, 2020 - 5:30pm
End: 
Tuesday, February 25, 2020 - 7:00pm
Description

A firmware update will be applied to the Dell EMC SAN storage array in Lindquist Center (LC).

There are no expected impacts to services.

 

Buildings
Lindquist Center
Last updated: 
Tuesday, February 25, 2020 - 7:00pm
Start: 
Saturday, February 15, 2020 - 4:00am
End: 
Saturday, February 15, 2020 - 8:00am
Description

Scheduled Work:  F5 chassis hardware refresh migration

Data Center(s):  Lindquist Center (LC)

Expected Impact on Services:  None

Expected Duration:  4 hours

Time:  04:00 AM - 08:00 AM

Last updated: 
Saturday, February 15, 2020 - 8:00am
Start: 
Saturday, January 11, 2020 - 6:00am
End: 
Saturday, January 11, 2020 - 8:00am
Description

Scheduled Work: Upgrade NetApp clusters

Data center(s): Information Technology Facility (ITF) and Lindquist Center (LC)

Expected impact on services: Each volume will experience two brief (10-30 seconds) pauses in IO

Expected Duration: 2 hours total (6 AM - 8 AM) 

Services affected include:

Home (H:) Drives:  .pst files located on these drives are particularly sensitive to drops in connectivity. Instruct users to close all applications (Outlook, Word, Excel) to their Home or H: Drive on Friday before leaving work.

Shared Departmental Drives:  L:, I:, and U: SFTP jobs and instruments connected to these locations are sensitive to drops in connectivity.  Modify as necessary.

RDSS:  Research Data Storage Service is included in this upgrade.

Last updated: 
Saturday, January 11, 2020 - 8:00am
Start: 
Wednesday, November 27, 2019 - 5:30pm
End: 
Wednesday, November 27, 2019 - 7:00pm
Description

A firmware update will be applied to the Dell EMC SAN storage array in ITF. This update will cause no impact to services.

Buildings
Information Technology Facility
Last updated: 
Wednesday, November 27, 2019 - 7:00pm
Start: 
Tuesday, November 26, 2019 - 5:30pm
End: 
Tuesday, November 26, 2019 - 7:00pm
Description

A firmware update will be applied to the Dell EMC SAN storage array in LC. This update will cause no impact to services.

Buildings
Lindquist Center
Last updated: 
Tuesday, November 26, 2019 - 7:00pm
Start: 
Sunday, November 17, 2019 - 4:00am
End: 
Sunday, November 17, 2019 - 8:00am
Description

Scheduled Work:  F5 chassis maintenance

Data Center(s):  Lindquist Center (LC) and Information Technology Facility (ITF)

Expected Impact on Services:  None

Expected Duration:  4 hours

Time:  04:00 AM - 08:00 AM

 

Scheduled Work:  Replace a failing fabric card in rtr-lc-1 (the LC data center router)

Data Centers:  Lindquist Center (LC)

Expected Impact on Services:  None expected but using scheduled window as a precaution

Expected Duration:  30 minutes

Time:  06:30 AM - 07:00 AM

Last updated: 
Sunday, November 17, 2019 - 8:00am
Start: 
Sunday, October 13, 2019 - 4:30am
End: 
Sunday, October 13, 2019 - 7:00am
Description

Scheduled work:  An end of row switch has experienced failed ports.  The switch will be rebooted and if necessary replaced with a spare. The switch in question is located at the south end of row BA.  Impacted cabinets and device owners will be communicated with in a separate, more focused communication.

Data center(s): Information Technology Facility (ITF)

Expected Duration: 90 minutes total (4:30 AM - 6:00 AM)

 

Scheduled work: Move research network links at ITF from over-subscribed cards to line-rate cards:

  • link to each of 2 research firewalls
  • 1 link in LC<>ITF 2x10G agg link

Data center(s): Information Technology Facility (ITF)

Expected impact on services:  No impact is expected because the firewalls should fail-over seamlessly and the LC<>ITF agg link should remain up at 1x10g

Expected Duration: 1 hour total (6 AM - 7 AM) 

Last updated: 
Sunday, October 13, 2019 - 7:00am
Start: 
Tuesday, October 1, 2019 - 6:00am
End: 
Tuesday, October 1, 2019 - 7:00am
Description

The NetApp root volume at ITF will be migrated during this time. The controller is a pair of active-active nodes so disk and network services are moved to the partner node during the migration. This node primarily provides storage for VMware and Hyper-V hypervisors. Home drives and departmental drives will not be affected and no disruption of service is expected. 

Last updated: 
Tuesday, October 1, 2019 - 7:00am
Start: 
Saturday, September 14, 2019 - 6:00am
End: 
Saturday, September 14, 2019 - 8:00am
Description

Scheduled Work: Upgrade NetApp clusters

Data center(s): Information Technology Facility (ITF) and Lindquist Center (LC)

Expected impact on services: Each volume will experience two brief (10-30 seconds) pauses in IO

Expected Duration: 2 hours total (6 AM - 8 AM) 

Services affected include:

Home (H:) Drives:  .pst files located on these drives are particularly sensitive to drops in connectivity. Instruct users to close all applications (Outlook, Word, Excel) to their Home or H: Drive on Friday before leaving work.

Shared Departmental Drives:  L:, I:, and U: SFTP jobs and instruments connected to these locations are sensitive to drops in connectivity.  Modify as necessary.

RDSS:  Research Data Storage Service is included in this upgrade.

Last updated: 
Saturday, September 14, 2019 - 8:00am
Start: 
Saturday, July 20, 2019 - 4:00am
End: 
Saturday, July 20, 2019 - 8:00am
Description

Scheduled Work: Upgrade NetApp clusters

Data center(s): Information Technology Facility (ITF) and Lindquist Center (LC)

Expected impact on services: Each volume will experience two brief (10-30 seconds) pauses in IO

Expected Duration: 2 hours total (6 AM - 8 AM) 

Services affected include:

Home (H:) Drives:  .pst files located on these drives are particularly sensitive to drops in connectivity. Instruct users to close all applications (Outlook, Word, Excel) to their Home or H: Drive on Friday before leaving work.

Shared Departmental Drives:  L:, I:, and U: SFTP jobs and instruments connected to these locations are sensitive to drops in connectivity.  Modify as necessary.

RDSS:  Research Data Storage Service is included in this upgrade.

 

Scheduled Work: F5 chassis maintenance

Data center(s): Lindquist Center (LC) and Information Technology Facility (ITF)

Expected impact on services: None

Expected Duration: 4 hours (4 AM - 8 AM)

 

 

Last updated: 
Saturday, July 20, 2019 - 8:00am
Start: 
Tuesday, July 16, 2019 - 6:00pm
End: 
Tuesday, July 16, 2019 - 6:30pm
Description

The ITS SST Storage Team will be rebooting a single NetApp controller.  This work is on the recommendation of vendor support to resolve some communication issues and stabilize the environment ahead of the scheduled upgrade work this Saturday for Infrastructure Day.

If you have questions, please contact the ITS SST Storage Team at its-storage@iowa.uiowa.edu.

Last updated: 
Tuesday, July 16, 2019 - 6:30pm
Start: 
Saturday, June 1, 2019 - 8:00am
End: 
Saturday, June 1, 2019 - 4:00pm
Description

Scheduled work:  Upgrade NetApp clusters

Data center(s):  Information Technology Facility (ITF)

Expected impact on services:  No impact is expected

Last updated: 
Saturday, June 1, 2019 - 4:00pm
Start: 
Saturday, June 1, 2019 - 8:00am
End: 
Saturday, June 1, 2019 - 12:00pm
Description

Scheduled work:  Replace NetApp controller

Data center(s):  Information Technology Facility (ITF)

Expected impact on services:  No impact is expected

Last updated: 
Saturday, June 1, 2019 - 12:00pm
Start: 
Monday, April 29, 2019 - 1:30pm
End: 
Monday, April 29, 2019 - 3:30pm
Description

The system smtp2-submit will be upgraded. During this time period the other campus mail submission server will be available.

Customers that access the single IP address for this server will experience email submission failures during this time. The suggested configuration is to use the DNS name ns-mx.uiowa.edu as it provides redundancy.

Last updated: 
Monday, April 29, 2019 - 3:30pm
Start: 
Wednesday, April 24, 2019 - 1:30pm
End: 
Wednesday, April 24, 2019 - 3:30pm
Description

The system smtp1-submit will be upgraded. During this time period the other campus mail submission server will be available.

Customers that access the single IP address for this server will experience email submission failures during this time. The suggested configuration is to use the DNS name ns-mx.uiowa.edu as it provides redundancy.

Last updated: 
Wednesday, April 24, 2019 - 3:30pm
Start: 
Tuesday, April 2, 2019 - 9:30am
End: 
Thursday, April 4, 2019 - 7:30am
Updates
Thursday, April 4, 2019 - 7:30am

Replacement equipment has been installed and service restored. 

Description

A hardware failure of one of the ITF F5 chassis systems has resulted in loss of redundancy for services that use the ITF LTM load balancer.

Replacement equipment has been ordered and will be installed and configured upon arrival. Until then, LTM services are functional on secondary equipment.

 

Last updated: 
Wednesday, September 15, 2021 - 2:46pm
Start: 
Wednesday, March 27, 2019 - 5:30pm
End: 
Wednesday, March 27, 2019 - 7:00pm
Description

A firmware update will be applied to the Dell EMC SAN storage array in ITF.

Last updated: 
Wednesday, March 27, 2019 - 7:00pm
Start: 
Tuesday, March 26, 2019 - 5:30pm
End: 
Tuesday, March 26, 2019 - 7:00pm
Description

A firmware update will be applied to the Dell EMC SAN storage array in LC.

Last updated: 
Tuesday, March 26, 2019 - 7:00pm
Start: 
Thursday, March 21, 2019 - 6:00am
End: 
Thursday, March 21, 2019 - 8:00am
Description

Nature of the work – Upgrade the F5 LTM system software to stay current with releases, improve reliability, address security issues, and provide new features.
 
Work process - The F5 LTM systems are a redundant pair in each data center. Each F5 LTM pair will be upgraded as follows: (1) Upgrade standby LTM; (2) shift services from the primary LTM to the standby LTM; (3) upgrade primary LTM; (4) shift services from the standby LTM back to the primary LTM.

Last updated: 
Thursday, March 21, 2019 - 8:00am
Start: 
Wednesday, March 20, 2019 - 6:00am
End: 
Wednesday, March 20, 2019 - 8:00am
Description

Nature of the work – Upgrade the F5 LTM system software to stay current with releases, improve reliability, address security issues, and provide new features.
 
Work process - The F5 LTM systems are a redundant pair in each data center. Each F5 LTM pair will be upgraded as follows: (1) Upgrade standby LTM; (2) shift services from the primary LTM to the standby LTM; (3) upgrade primary LTM; (4) shift services from the standby LTM back to the primary LTM.

Last updated: 
Wednesday, March 20, 2019 - 8:00am
Start: 
Wednesday, January 30, 2019 - 6:00am
End: 
Wednesday, January 30, 2019 - 8:00am
Description

The IT Facility F5 GTM/DNS system will be upgraded. The Lindquist Center F5 GTM/DNS system will be upgraded following the ITF upgrade. No service impact is expected.

Last updated: 
Wednesday, January 30, 2019 - 8:00am
Start: 
Saturday, January 12, 2019 - 6:00am
End: 
Saturday, January 12, 2019 - 8:00am
Description

Scheduled work:  Upgrade NetApp clusters

Data center(s):  Information Technology Facility (ITF) and Lindquist Center (LC)

Expected impact on services:  Each volume will experience two brief (10-30 seconds) pauses in IO

Services affected include:

Home (H:) Drives:  .pst files located on these drives are particularly sensitive to drops in connectivity. Instruct users to close all applications (Outlook, Word, Excel) to their Home or H: Drive on Friday before leaving work.

Shared Departmental Drives:  L:, I:, and U: SFTP jobs and instruments connected to these locations are sensitive to drops in connectivity.  Modify as necessary.

RDSS:  Research Data Storage Service is included in this upgrade.

Last updated: 
Saturday, January 12, 2019 - 8:00am
Start: 
Wednesday, November 28, 2018 - 6:00pm
End: 
Wednesday, November 28, 2018 - 7:30pm
Description

A firmware update will be applied to the Dell EMC SAN storage array in ITF.

There will be no impact to services during the maintenance.

Buildings
Information Technology Facility
Last updated: 
Wednesday, November 28, 2018 - 7:30pm
Start: 
Tuesday, November 27, 2018 - 6:00pm
End: 
Tuesday, November 27, 2018 - 7:30pm
Description

A firmware update will be applied to the Dell EMC SAN storage array in LC.

There will be no impact to services during the maintenance.

Buildings
Lindquist Center
Last updated: 
Tuesday, November 27, 2018 - 7:30pm
Start: 
Thursday, September 20, 2018 - 6:00am
End: 
Thursday, September 20, 2018 - 8:00am
Description

Nature of the work – Upgrade the F5 GTM/DNS systems system software to stay current with releases, improve reliability, address security issues, and provide new features.

Work process - The F5 GTM/DNS systems provide the same DNS information. The ITF F5 GTM/DNS system will be upgraded first followed by the LC F5 GTM/DNS system. No service impact is expected.

Last updated: 
Thursday, September 20, 2018 - 8:00am
Start: 
Saturday, August 11, 2018 - 6:00am
End: 
Saturday, August 11, 2018 - 8:00am
Description

Scheduled work:  Upgrade NetApp clusters

Data center(s):  Information Technology Facility (ITF) and Lindquist Center (LC)

Expected impact on services:  Each volume will experience two brief (10-30 seconds) pauses in IO

Services affected include:

Home (H:) Drives:  .pst files located on these drives are particularly sensitive to drops in connectivity. Instruct users to close all applications (Outlook, Word, Excel) to their Home or H: Drive on Friday before leaving work.

Shared Departmental Drives:  L:, I:, and U: SFTP jobs and instruments connected to these locations are sensitive to drops in connectivity.  Modify as necessary.

RDSS:  Research Data Storage Service is included in this upgrade.

Last updated: 
Saturday, August 11, 2018 - 8:00am
Start: 
Friday, August 10, 2018 - 6:00am
End: 
Friday, August 10, 2018 - 8:00am
Description

Nature of the work – Upgrade the F5 LTM system software to stay current with releases, improve reliability, address security issues, and provide new features.

 

Work process - The F5 LTM systems are a redundant pair in ITF. The ITF F5 LTM pair will be upgraded as follows: (1) Upgrade standby LTM; (2) shift services from the primary LTM to the standby LTM; (3) upgrade primary LTM; (4) shift services from the standby LTM back to the primary LTM.

Last updated: 
Friday, August 10, 2018 - 8:00am
Start: 
Thursday, August 9, 2018 - 6:00am
End: 
Thursday, August 9, 2018 - 8:00am
Description

Nature of the work – Upgrade the F5 LTM system software to stay current with releases, improve reliability, address security issues, and provide new features.

 

Work process - The F5 LTM systems are a redundant pair in LC. The LC F5 LTM pair will be upgraded as follows: (1) Upgrade standby LTM; (2) shift services from the primary LTM to the standby LTM; (3) upgrade primary LTM; (4) shift services from the standby LTM back to the primary LTM.

Last updated: 
Thursday, August 9, 2018 - 8:00am
Start: 
Saturday, June 9, 2018 - 4:00am
End: 
Saturday, June 9, 2018 - 8:00am
Description

Scheduled work:  Upgrade the F5 chassis system software to stay current with releases, improve reliability, address security issues, and provide new features

Data center(s):  Information Technology Facility (ITF) and Lindquist Center (LC)

Expected Duration:  4-hours (4 AM - 8 AM)

Expected impact on services:  Non-disruptive upgrade.  No impact on services

 

Scheduled work:  Software updates and server reboot if needed for itf-rs-store16 and lc-rs-storage02

Data center(s):  Information Technology Facility (ITF) and Lindquist Center (LC)

Expected Duration: 1-hour max (7 AM - 8 AM)

Expected impact on services:  Minimal unless the updates demand a reboot.  Compliant LSS Pilot service might be unavailable and users should plan accordingly.  This affects the pilot systems only, Large Scale Storage (LSS) and HPC attached storage will not be affected.

Last updated: 
Saturday, June 9, 2018 - 8:00am
Start: 
Thursday, May 24, 2018 - 6:00pm
End: 
Thursday, May 24, 2018 - 7:30pm
Description

Scheduled work:  A hotfix will be applied to the Dell EMC SAN storage array in the ITF.

Data center(s):  Information Technology Facility (ITF)

Expected impact on services:  Non-disruptive update; no impact to services.

 

Last updated: 
Thursday, May 24, 2018 - 7:30pm
Start: 
Wednesday, May 23, 2018 - 6:00pm
End: 
Wednesday, May 23, 2018 - 7:30pm
Description

Scheduled work:  A hotfix will be applied to the Dell EMC SAN storage array in LC.

Data center(s):  Lindquist Center (LC)

Expected impact on services:  Non-disruptive update; no impact to services.

 

Last updated: 
Wednesday, May 23, 2018 - 7:30pm
Start: 
Saturday, April 21, 2018 - 6:00am
End: 
Saturday, April 21, 2018 - 8:00am
Description

Scheduled work:  OS Firmware update on the Dell EMC Unity all-flash SAN storage arrays

Data center(s):  Information Technology Facility (ITF) and Lindquist Center (LC)

Expected Duration:  2-hours (6 AM - 8 AM)

Expected impact on services:  Non-disruptive upgrade.  No impact on services

 

Scheduled work:  Software updates and server reboot if needed for itf-rs-store16 and lc-rs-storage02

Data center(s):  Information Technology Facility (ITF) and Lindquist Center (LC)

Expected Duration: 1-hour max (7 AM - 8 AM)

Expected impact on services:  Minimal unless the updates demand a reboot.  Compliant LSS Pilot service might be unavailable and users should plan accordingly.  This affects the pilot systems only, Large Scale Storage (LSS) and HPC attached storage will not be affected.

Last updated: 
Saturday, April 21, 2018 - 8:00am
Start: 
Saturday, March 31, 2018 - 10:00am
End: 
Saturday, March 31, 2018 - 12:00pm
Description

The Dell EMC SAN storage array located at ITF has a faulty DIMM that needs replaced. One of the redundant storage processors will be shut down while the faulty hardware is replaced. ITS SAN attached servers (including various SQL Server, Oracle, VMware and Hyper-V hosts) will have two of their four paths to SAN disks during this time. There is no expected impact to services. 

 

Contacts: Seth Clarke, Cody Johnson, David Bronder

 

 

Last updated: 
Saturday, March 31, 2018 - 12:00pm
Start: 
Saturday, March 10, 2018 - 6:00am
End: 
Saturday, March 10, 2018 - 8:00am
Description

Scheduled work:  Upgrade NetApp clusters

Data center(s):  Information Technology Facility (ITF) and Lindquist Center (LC)

Expected Duration:  2 hours (6 AM - 8 AM)

Expected impact on services:  Each volume will experience two brief (10-30 seconds) pauses in IO

Services affected include:

Home (H:) Drives:  .pst files located on these drives are particularly sensitive to drops in connectivity. Instruct users to close all applications (Outlook, Word, Excel) to their Home or H: Drive on Friday before leaving work.

Shared Departmental Drives:  L:, I:, and U: SFTP jobs and instruments connected to these locations are sensitive to drops in connectivity.  Modify as necessary.

RDSS:  Research Data Storage Service is included in this upgrade.

 

Scheduled work:  Software updates and server reboot if needed for itf-rs-store16 and lc-rs-storage02

Data center(s):  Information Technology Facility (ITF) and Lindquist Center (LC)

Expected Duration:  1 hour max (7 AM - 8 AM)

Expected impact on services:  Minimal unless the updates demand reboot.  Compliant LSS Pilot service might be unavailable and users should plan accordingly.  This affects the pilot systems only, Large Scale Storage (LSS) and HPC attached storage will not be affected.

Last updated: 
Saturday, March 10, 2018 - 8:00am
Start: 
Saturday, January 6, 2018 - 6:00am
End: 
Saturday, January 6, 2018 - 8:00am
Description

Scheduled work:  Upgrade NetApp clusters

Data center(s):  Information Technology Facility (ITF) and Lindquist Center (LC)

Expected impact on services:  Each volume will experience two brief (10-30 seconds) pauses in IO

Services affected include:

Home (H:) Drives:  .pst files located on these drives are particularly sensitive to drops in connectivity. Instruct users to close all applications (Outlook, Word, Excel) to their Home or H: Drive on Friday before leaving work.

Shared Departmental Drives:  L:, I:, and U: SFTP jobs and instruments connected to these locations are sensitive to drops in connectivity.  Modify as necessary.

RDSS:  Research Data Storage Service is included in this upgrade.

Last updated: 
Saturday, January 6, 2018 - 8:00am
Start: 
Saturday, November 25, 2017 - 6:00am
End: 
Saturday, November 25, 2017 - 8:00am
Description

ITS will upgrade the F5 LTM system software to stay current with releases, improve reliability, address security issues, and provide new features.

Last updated: 
Saturday, November 25, 2017 - 8:00am
Start: 
Saturday, October 14, 2017 - 6:00am
End: 
Saturday, October 14, 2017 - 8:00am
Description

Scheduled work:  Upgrade NetApp clusters

Data center(s):  Information Technology Facility (ITF) and Lindquist Center (LC)

Expected impact on services:  Each volume will experience two brief (10-30 seconds) pauses in IO

Services affected include:

Home (H:) Drives:  .pst files located on these drives are particularly sensitive to drops in connectivity. Instruct users to close all applications (Outlook, Word, Excel) to their Home or H: Drive on Friday before leaving work.

Shared Departmental Drives:  L:, I:, and U: SFTP jobs and instruments connected to these locations are sensitive to drops in connectivity.  Modify as necessary.

RDSS:  Research Data Storage Service is included in this upgrade.

Last updated: 
Saturday, October 14, 2017 - 8:00am
Start: 
Saturday, August 12, 2017 - 5:00am
End: 
Saturday, August 12, 2017 - 7:00am
Description

Scheduled work:  Upgrade NetApp clusters

Data center(s):  Information Technology Facility (ITF) and Lindquist Center (LC)

Expected impact on services:  Each volume will experience two brief (10-30 seconds) pauses in IO

Services affected include:

Home (H:) Drives:  .pst files located on these drives are particularly sensitive to drops in connectivity. Instruct users to close all applications (Outlook, Word, Excel) to their Home or H: Drive on Friday before leaving work.

Shared Departmental Drives:  L:, I:, and U: SFTP jobs and instruments connected to these locations are sensitive to drops in connectivity.  Modify as necessary.

RDSS:  Research Data Storage Service is included in this upgrade.

Last updated: 
Saturday, August 12, 2017 - 7:00am
Start: 
Friday, July 14, 2017 - 6:00am
End: 
Friday, July 14, 2017 - 8:00am
Description

Data center: Information Technology Facility (ITF)
Expected impact on services: none

The F5 LTM system software will be upgraded to stay current with releases, improve reliability, address security issues, and provide new features.

The ITF F5 LTM pair will be upgraded as follows:

  1. Upgrade ITF standby LTM;
  2. Shift services from the ITF primary LTM to the standby LTM;
  3. Upgrade ITF primary LTM;
  4. Shift services from the ITF standby LTM back to the primary LTM.
Last updated: 
Friday, July 14, 2017 - 8:00am
Start: 
Thursday, July 13, 2017 - 5:00pm
End: 
Thursday, July 13, 2017 - 8:00pm
Description

ITS will be upgrading firmware on the Cisco UCS blade server infrastructure in the ITF datacenter. These upgrades will address bugs and security issues, provide new features and allow easier updates in the future.

These environments host ITS-managed VMware and some Hyper-V services in ITF. The infrastructure components have redundant units and connections. No service impact is expected.

Last updated: 
Thursday, July 13, 2017 - 8:00pm
Start: 
Wednesday, July 12, 2017 - 5:00pm
End: 
Wednesday, July 12, 2017 - 7:00pm
Description

ITS will be upgrading firmware on the Cisco UCS blade server infrastructure in the Lindquist Center datacenter. These upgrades will address bugs and security issues, provide new features and allow easier updates in the future.

These environments host ITS-managed VMware services in LC. The infrastructure components have redundant units and connections. No service impact is expected.

Last updated: 
Wednesday, July 12, 2017 - 7:00pm
Start: 
Wednesday, July 12, 2017 - 6:00am
End: 
Wednesday, July 12, 2017 - 8:00am
Description

Data center: Lindquist Center
Expected impact on services: none

The F5 LTM system software will be upgraded to stay current with releases, improve reliability, address security issues, and provide new features. 

The LC F5 LTM pair will be upgraded as follows:

  1. Upgrade LC standby LTM
  2. Shift services from the LC primary LTM to the standby LTM
  3. Upgrade LC primary LTM
  4. Shift services from the LC standby LTM back to the primary LTM
Last updated: 
Wednesday, July 12, 2017 - 8:00am
Start: 
Saturday, July 8, 2017 - 8:00am
End: 
Saturday, July 8, 2017 - 9:00am
Description

Firewall Software Upgrade

Scheduled work: Upgrade software on ITF Data Center Firewalls

Data center(s): Information Technology Facility (ITF)

Expected impact on services: none - failover pair will be used for hitless software upgrade

Last updated: 
Saturday, July 8, 2017 - 9:00am
Start: 
Saturday, June 10, 2017 - 6:00am
End: 
Saturday, June 10, 2017 - 8:00am
Description

Firewall Update

Scheduled work: Replace Lindquist Center Data Center Firewalls

Data center(s): 14 Lindquist Center (LC)

Expected impact on services: Machines behind the LC firewall will experience an outage as this is a hardware replacement

Last updated: 
Saturday, June 10, 2017 - 8:00am
Start: 
Wednesday, June 7, 2017 - 6:00am
End: 
Wednesday, June 7, 2017 - 8:00am
Description

Upgrading the F5 GTM/DNS system software to stay current with releases, improve reliability, address security issues, and provide new features.

The F5 GTM/DNS systems provide the same DNS information. The ITF F5 GTM/DNS system will be upgraded first followed by the Lindquist Center F5 GTM/DNS system. No service impact is expected.

Last updated: 
Wednesday, June 7, 2017 - 8:00am
Start: 
Saturday, April 8, 2017 - 4:00am
End: 
Saturday, April 8, 2017 - 8:00am
Description

ITF Network Switch Work

Scheduled work: Apply microcode to an end of row network switch and replace a failed port on another end of row network switch.

Data center(s): Information Technology Facility (ITF)

Expected impact on services: Network connections to these switches will be out of service for between 15 and 60 minutes. Redundantly connected services will remain network connected. Single network connected servers to the impacted switches will lose connectivity. A complete list of servers affected is available on request.

F5 – Upgrade Chassis System Software

Scheduled work: Upgrade the F5 chassis system software to stay current with releases, improve reliability, address security issues, and provide new features.

Data center(s): Information Technology Facility (ITF) & Lindquist Center

Expected impact on services: No more than one GTM/DNS and one LTM system will be unavailable at any time. No service impact is expected.

Last updated: 
Saturday, April 8, 2017 - 8:00am

Data Center Operations & Services Contact Information